Measure the space the concrete fills
Volume is the inside of the form or hole, not the size on the drawing. For a slab or footing, multiply length × width × thickness. For a round pier, use π × radius² × depth. Break odd shapes into simple ones and add them up.
Measure after the forms are set if you can. The finished forms and the numbers on the plan don’t always agree, and the forms are what you’re filling.
- Convert thickness in inches to feet before multiplying with feet.
- Use the hole or form diameter for piers, not the post diameter.
- Calculate thickened edges, steps and grade beams as separate shapes.
Cubic feet to cubic yards, then to bags
A cubic yard is 27 cubic feet. For the 10 × 10 ft slab, 4 in is a third of a foot, so 100 sq ft × 1/3 ft = 33.33 cu ft, and 33.33 ÷ 27 = 1.23 cubic yards.
For bags, divide cubic feet by the yield printed on the bag and round up. At 0.6 cu ft per 80 lb bag, that slab takes 56 bags. In 60 lb bags it’s 75, and in 40 lb bags 112.
Add the extra only after you know the measured volume. It covers a wavy subgrade and what’s left in the wheelbarrow. It doesn’t replace measuring.
Concrete chart: cubic yards and 80 lb bags by slab size
Volumes are the measured slab with nothing added. Bags use 0.60 cu ft per 80 lb bag, the yield on QUIKRETE’s Concrete Mix data sheet, rounded up to whole bags. Going from 4 in to 6 in adds half again to every row.
| Slab, ft | 4 in: cu yd | 4 in: 80 lb bags | 6 in: cu yd | 6 in: 80 lb bags |
|---|---|---|---|---|
| 4 x 4 | 0.20 | 9 | 0.30 | 14 |
| 10 x 10 | 1.23 | 56 | 1.85 | 84 |
| 12 x 12 | 1.78 | 80 | 2.67 | 120 |
| 10 x 20 | 2.47 | 112 | 3.70 | 167 |
| 12 x 24 | 3.56 | 160 | 5.33 | 240 |
| 20 x 20 | 4.94 | 223 | 7.41 | 334 |
| 24 x 24 | 7.11 | 320 | 10.67 | 480 |
Round piers and post holes
A round hole is π × radius² × depth. A 12 in hole is 0.5 ft across the radius, so 4 ft deep it holds 3.14 × 0.25 × 4 = 3.14 cu ft. That’s 0.12 cubic yards, or 6 bags of 80 lb mix and 7 of 60 lb.
Holes multiply fast. Twelve of those piers take 72 bags of 80 lb mix, more than the whole 10 × 10 slab above. For a fence, subtract the post from each hole; the fence post guide works that through with a chart.
Worked example: a 12 × 24 ft patio, 4 in thick
Area: 12 × 24 = 288 sq ft. Thickness: 4 in is 1/3 ft, so 288 × 1/3 = 96 cu ft, and 96 ÷ 27 = 3.56 cubic yards measured.
Add the concrete calculator’s default 10 percent and the order is 105.6 cu ft, or 3.91 cubic yards. In bags that’s 176 of 80 lb, 235 of 60 lb or 352 of 40 lb.
At 176 bags, get a ready-mix quote before you price bags. Ask about the plant’s minimum load and short-load fee, and whether the truck can reach the forms or needs a pump or a line of wheelbarrows.
What goes wrong with concrete estimates
Four mistakes that throw off the order:
- Multiplying feet by inches. Convert the thickness to feet first.
- Using the post size instead of the hole size for a pier or post hole.
- Counting bags for the wrong size. A 60 lb bag yields less than an 80 lb bag, so you need more of them.
- Ordering ready-mix to the exact volume. If the truck runs short, the end of the pour waits for another load.
Before you schedule the pour
Confirm truck access, the supplier’s minimum load and the delivery window before you order ready-mix. Concrete won’t wait for you. The structural details (how thick, what reinforcement, how big the footings) come from the plans or local code, not from a volume calculator.
Sources and further verification
These are the references behind the numbers above. If your supplier or the bag label gives a different figure for your exact product, use theirs.