Skip to main content
TonMath Find a calculator

Paver Patio Material Calculator

A 20 × 12 ft patio laid in 8 × 4 in pavers takes 1,188 pavers, or 27 boxes at 10 sq ft each, once you add 10% for cuts. Under them go 3.26 cu yd of base gravel at 4 in deep, about 4.4 tons, and 0.81 cu yd of bedding sand at 1 in.

Best for: a patio made of one or more rectangles, when you want the pavers and the stone under them on one list.

Your project measurements

ft
ft
in
in
in
Edit assumptions & pricing
in
sq ft
%
$
$
ft
50.0 ft 12.0 ft Bedding sand Base 4 in 6 in
    Live measurement plan. Schematic, not to scale; values update as you edit.
    Estimated total — Enter project measurements to calculate.

    How the Paver Patio Material Calculator works

    The planner totals the area of every rectangle you add. Pavers and boxes come from the paver face size and the box coverage, base and sand from their depths, and edging from the outside perimeter.

    Base depth moves the order more than anything else here. Take the same patio from a 4 in base to a 6 in base and the gravel goes from 3.26 cu yd (4.4 tons) to 4.89 cu yd (6.6 tons).

    This page starts from 2 published figures and 4 planning values, each listed under Sources and verification below. When the bag, the box or your supplier’s quote says something different, type their number under “Edit assumptions & pricing” and the plan updates.

    Formula

    1. Patio area = total length × width
    2. Pavers / boxes = area ÷ unit coverage, rounded up
    3. Base or sand volume = area × layer depth
    4. Order quantities = calculated quantities × (1 + waste %)

    Worked example

    Here’s the default patio: 20 × 12 ft, 8 × 4 in pavers in 10 sq ft boxes, a 4 in base, 1 in of sand and 10% extra.

    1. Area: 20 × 12 ft = 240 sq ft. The edging follows the 64 ft perimeter.
    2. Pavers before extra: 1,080 pieces, or 24 boxes.
    3. Add 10% for cuts: 1,188 pavers and 27 boxes. Boxes always round up.
    4. Base: 240 sq ft at 4 in plus 10% is 3.26 cu yd, which is 4.4 tons at 1.35 tons per cu yd.
    5. Sand: the same area at 1 in plus 10% is 0.81 cu yd, about 1.1 tons.

    Your material plan reference

    The table fills in from whatever you entered above. Anything sold in whole units is already rounded up, while volumes and weights keep their full precision from step to step.

    Material or measurementCurrent calculated quantity
    Calculate to populate

    What usually goes wrong

    • Treating an L-shaped patio as one big rectangle. Enter each leg as its own area and put the length of the edge they share in “Shared internal edges” so the edging isn’t counted twice.
    • Ordering by piece count. Pieces come from the face size; the coverage printed on the box is what you actually buy against.
    • Dropping the extra to save money. With no extra this patio needs 1,080 pavers, and border cuts use up spares quickly.
    • Expecting the cost line to cover the whole job. It prices pavers and base only; sand, edging and delivery need their own quotes.

    Frequently asked questions

    How many pavers do I need for a 20 × 12 patio?

    With 8 × 4 in pavers, 1,188 pieces including 10% for cuts. That’s 27 boxes at 10 sq ft per box, or 1,080 pavers with no extra.

    How much base and sand goes under pavers?

    For this patio, 3.26 cu yd of base at 4 in and 0.81 cu yd of sand at 1 in, both with 10% extra. Your paver maker’s spec sets the real depths.

    Can I plan an L-shaped patio?

    Yes. Add each rectangle as its own area and type the length of the edge they share once. You get one combined list.

    Sources and verification

    Before you order, check the paver’s face size and box coverage on the product sheet and the base and bedding depths your paver maker calls for. The defaults here are examples, not a spec.

    Where the defaults come from

    No published figure backs these, so treat them as planning values and set them for your job: paver size, coverage per box, waste (also applied to base and sand volumes), base and sand density. Prices are placeholders; use your supplier’s quote.

    The geometry and unit conversions behind this page are written out in the calculation methodology. The sources and verification policy says where the defaults come from and what they don’t claim.