How the Concrete Calculator works
Pick a shape and the page uses its volume formula: a box for slabs and walls, a cylinder for round columns, and a cylinder minus the hole for tubes. That’s multiplied by identical sections, the extra goes on, and cubic feet are divided by 27 for cubic yards.
Thickness changes the answer fastest. The same slab at 6 in is 4.44 cu yd before extra, against 2.96 at 4 in.
This page starts from 6 published figures and 1 planning value, each listed under Sources and verification below. When the bag, the box or your supplier’s quote says something different, type their number under “Edit assumptions & pricing” and the plan updates.
Formula
- Rectangle volume = length × width × thickness
- Round volume = π × radius² × height
- Tube volume = outer cylinder − inner cylinder
- Order volume = net volume × (1 + extra %)
Worked example
A 20 × 12 ft slab, 4 in thick, one section and 10% extra.
- Volume: 20 × 12 ft at 4 in = 80 cu ft.
- Cubic yards: 80 ÷ 27 = 2.96.
- Add 10%: 3.26 cu yd to order, which is 88 cu ft.
- Bags: 88 ÷ 0.60 rounds up to 147 bags of 80 lb, or 196 bags of 60 lb at 0.45 cu ft.
Your material plan reference
The table fills in from whatever you entered above. Anything sold in whole units is already rounded up, while volumes and weights keep their full precision from step to step.
| Material or measurement | Current calculated quantity |
|---|---|
| Calculate to populate | |
What usually goes wrong
- Mixing inches and feet. Thickness goes in inches and everything else in feet; the page converts, but hand checks often slip here.
- Measuring the plan instead of the forms. Bowed forms or a dip in the subgrade add volume, so measure once the forms are set.
- Ordering exactly 2.96 cu yd. Running short mid-pour is worse than a little left over, which is what the 10% is for.
- Expecting this page to design the slab. Reinforcement, joints and strength come from your plans or a pro.
Frequently asked questions
How many yards of concrete for a 20 × 12 slab?
At 4 in thick, 2.96 cu yd, or 3.26 with 10% extra. At 6 in thick, 4.44 cu yd before extra.
How many bags of concrete make a yard?
One cubic yard is 27 cu ft. At 0.60 cu ft per 80 lb bag that’s 45 bags, and at 0.45 cu ft per 60 lb bag it’s 60.
When should I use the slab calculator instead?
When a rectangular slab has a thickened edge. That page adds only the extra depth around the perimeter.
Sources and verification
Take every dimension from the forms or the plans. For bags, use the yield printed on the mix you buy; for ready-mix, ask the plant about its minimum order and how it bills short loads.
Where the defaults come from
- 40 lb bag yield: 0.30 cu ft (QUIKRETE - Concrete Mix No. 1101 data sheet)
- 60 lb bag yield: 0.45 cu ft (QUIKRETE - Concrete Mix No. 1101 data sheet)
- 80 lb bag yield: 0.60 cu ft (QUIKRETE - Concrete Mix No. 1101 data sheet)
- Cubic yard to cubic meter: 0.764554858 m3/yd3 (NIST - SP 811 Appendix B.8 conversion factors)
- Inch/foot conversions (27 cu ft per cu yd is geometry): 12 in/ft; 27 cu ft/cu yd (NIST - SP 811 Appendix B.8 conversion factors)
- Default slab thickness: 4 in (QUIKRETE - Quantity calculator (assumptions))
No published figure backs these, so treat them as planning values and set them for your job: extra concrete / waste. Prices are placeholders; use your supplier’s quote.
The geometry and unit conversions behind this page are written out in the calculation methodology. The sources and verification policy says where the defaults come from and what they don’t claim.