Measure only the layer you’re adding
Measure the area and the depth you’ll add after grading. If good soil stays in place, estimate only the new layer. Topsoil isn’t compost, and neither is a blended planting mix; they do different jobs and may go on at different rates.
Add settling as its own step
Area × depth gives the installed volume: 200 sq ft at 4 in is 66.7 cu ft, or 2.47 cubic yards. Loose soil settles, so the soil calculator adds 12% for settlement and 5% extra by default and orders 2.9 cubic yards, about 2.9 tons or 53 bags of 1.5 cu ft.
If you’re buying by the ton, ask for the supplier’s weight for the product as it’s sold that day. Wet soil throws the conversion off.
- Measure low spots on their own instead of raising the whole yard.
- Ask whether the yard’s “yard” is a measured cubic yard.
- Ask about texture, debris and whether it’s screened.
The right amount of the wrong soil
Quantity can’t tell you whether the soil is any good. What you’re planting, how the site drains and how packed the existing ground is all affect the right soil and depth. Use a local soil test or your extension office when it matters.
Sources and further verification
These are the references behind the numbers above. If your supplier or the bag label gives a different figure for your exact product, use theirs.