Skip to main content
TonMath Find a calculator

French Drain Calculator

A 60 ft French drain in a trench 18 in wide with 18 in of gravel around a 4 in pipe takes 4.81 cu yd of gravel once the pipe is subtracted. With 10% for settling and 8% extra, order 5.71 cu yd, about 7.99 tons, plus 66 ft of pipe and 2 rolls of fabric.

Best for: a French drain whose route and outlet you’ve already worked out.

Your project measurements

ft
in
in
in
%
Edit assumptions & pricing
%
%
ft
sq ft
$
$
50.0 ft 12.0 ft Gravel 4 in
    Live measurement plan. Schematic, not to scale; values update as you edit.
    Estimated total — Enter project measurements to calculate.

    How the French Drain Calculator works

    Trench volume is length × width × gravel depth, and the pipe’s cylinder comes out of it. Settlement and extra allowances bring the gravel up to an order amount. The pipe gets its own extra length, and fabric is drain length × fabric width in whole rolls.

    Trench width matters most. At 12 in wide instead of 18, the same drain takes 3.73 cu yd of gravel instead of 5.71.

    This page starts from 3 published figures and 6 planning values, each listed under Sources and verification below. When the bag, the box or your supplier’s quote says something different, type their number under “Edit assumptions & pricing” and the plan updates.

    Formula

    1. Trench volume = length × width × gravel-filled depth
    2. Net gravel = trench volume − pipe cylinder volume
    3. Order gravel includes settlement and extra allowances
    4. Fabric area = drain length × selected fabric width

    Worked example

    A 60 ft trench, 18 in wide with 18 in of gravel, a 4 in pipe, 10% settling, 8% extra and 6 ft wide fabric in 300 sq ft rolls.

    1. Trench: 5 cu yd before the pipe.
    2. Less the pipe: 4.81 cu yd of gravel.
    3. With the allowances: 5.71 cu yd, about 7.99 tons.
    4. Pipe: 60 ft plus 10% = 66 ft. Fabric: 60 × 6 ft = 360 sq ft, or 2 rolls.

    Your material plan reference

    The table fills in from whatever you entered above. Anything sold in whole units is already rounded up, while volumes and weights keep their full precision from step to step.

    Material or measurementCurrent calculated quantity
    Calculate to populate

    What usually goes wrong

    • Digging before the utilities are marked. Have them located first.
    • Forgetting the outlet. Water needs somewhere lower to go, and a drain with no fall just holds it.
    • Sizing fabric to the trench bottom only. It has to wrap the gravel, so enter a width that covers the sides and the overlap.

    Frequently asked questions

    How much gravel for a French drain?

    For 60 ft at 18 × 18 in around a 4 in pipe, 5.71 cu yd with the allowances, about 7.99 tons. At 12 in wide, 3.73 cu yd.

    Why subtract the pipe from the gravel?

    The pipe takes up part of the trench. Here it’s the difference between 5 cu yd of trench and 4.81 cu yd of gravel.

    Does this calculator set slope or outlet size?

    No. It counts materials after the layout is settled.

    Sources and verification

    Confirm the trench profile, the outlet, the pipe size and perforation, the stone spec and the fabric size, and have utilities located. A quantity doesn’t prove the drain will carry water away.

    Where the defaults come from

    No published figure backs these, so treat them as planning values and set them for your job: trench width, extra pipe length, settlement allowance (gravel), extra gravel, filter fabric width, fabric coverage per roll. Prices are placeholders; use your supplier’s quote.

    The geometry and unit conversions behind this page are written out in the calculation methodology. The sources and verification policy says where the defaults come from and what they don’t claim.